Selecciona tu región e idioma

CanadaUS FR 
United StatesUS 
MexicoUS ES 
ArgentinaEN ES 
BoliviaEN ES 
BrazilEN ES 
ChileEN ES 
ColombiaEN ES 
PeruEN ES 
UruguayEN ES 
GermanyEN DE 
AustriaEN DE 
BelgiumEN FR NL 
BelarusEN 
Bosnia and HerzegovinaEN 
BulgariaEN 
CyprusEN 
CroatiaEN 
NetherlandsEN NL 
DenmarkEN 
SlovakiaEN 
SloveniaEN 
SpainEN ES 
EstoniaEN 
Russian FederationEN 
FinlandEN 
FranceEN FR 
GreeceEN 
HungaryEN 
IrelandEN 
IcelandEN 
ItalyEN IT 
KazakhstanEN 
LatviaEN 
LiechtensteinEN DE 
LithuaniaEN 
LuxembourgEN DE FR 
MaltaEN 
NorwayEN 
PolandEN 
PortugalEN ES 
United KingdomEN 
Czech RepublicEN 
RomaniaEN 
SerbiaEN 
SwedenEN 
SwitzerlandEN DE FR IT 
TurkeyEN 
UkraineEN 
EgyptEN 
MoroccoEN 
South AfricaEN 
TunisiaEN 
Saudi ArabiaEN 
BahrainEN 
QatarEN 
ChinaEN 
Korea, Democratic Republic ofEN 
Korea, Republic ofEN 
United Arab EmiratesEN 
PhilippinesEN 
Hong KongEN 
IndiaEN 
IndonesiaEN 
IsraelEN 
JapanEN 
KuwaitEN 
MalaysiaEN 
OmanEN 
SingaporeEN 
ThailandEN 
Taiwan, Province of ChinaEN 
UzbekistanEN 
Viet NamEN 
AustraliaEN 
New ZealandEN 
Pilotprojekt - Glasfaser ohne Einblasen
Pilotprojekt - Glasfaser ohne Einblasen

Pilot project - fiber optics without blowing

Septiembre 22, 2022


Under the direction of Graf Tiefbau GmbH from Leutkirch, we were allowed to participate in two pilot projects of Deutsche Telekom. Our fully hydraulic Unicut 600 road saw with Vacuum Wet 500 suction unit was used for this project. 17 cm deep under the asphalt surface, with a slot width of 17 mm, a new, reinforced fiber optic cable was laid. This was tested in Kippach, in the Ostallgäu district, and in Münnerstadt, in the Bad Kissingen district, with a daily capacity of over 300 m.

You can find moving images of the tested process at the following link https://youtu.be/_y1GwXKj8BU

Have fun with it.

Translated with www.DeepL.com/Translator (free version)